starbucks.jpg

Five-Month Turnaround

Construction for this new Starbucks location was completed in a record five months.
Starbucks, a national tenant, has specific, rigorous requirements for contractors who work with them. We coordinated with Starbucks’ management and in-house construction team to ensure that their custom components were perfectly placed.

Modified Plans

The site was located in a busy shopping center. We developed the new section with all of the details the cafe needed, including the lighting, parking, and pad prep. The original proposed layout had been modified, which required us to modify existing conditions during construction. The project also required considerable collaboration with Starbucks’ national team, to ensure perfect execution of their specific requirements


11/Nov/2024
11.jpg

State Highway Location

Due to its location on a state highway, we coordinated with the DOT, the state, and the county to meet all requirements.

We developed a new section of an existing property, which included lighting and additional parking, as well as the pad prep. As the future site of a high-traffic restaurant, there were significant additional requirements for grease control, as well as fire, water, and gas.